FLUOKIT M24 PDF

.

Author:Fenrigrel Malalmaran
Country:Burma
Language:English (Spanish)
Genre:Medical
Published (Last):21 August 2019
Pages:325
PDF File Size:17.3 Mb
ePub File Size:5.92 Mb
ISBN:880-3-53367-757-6
Downloads:7999
Price:Free* [*Free Regsitration Required]
Uploader:Vudolrajas



Tezragore Apparatus efficiency and apparatus life depend on the compliance with the installation, commissioning and operation instructions described in this user manual. Schneider Electric request the carefully reading of the following instructions in order to familiarize yourself with the product in this document before trying to install, operation, put fluokitt service or conduct the maintenance on it.

Definition of the substations. The room must be equipped with standardised high level and low level ventilation. Layout of the Functional Units. Protection equipments Only qualified and accredited people can operate on our products. Pouring the cement top coat Block off the irons to avoid penetration of cement into the rail. The other brand names mentioned within this document, whether they be copyright or not, belong to their respective holders.

Contacts Group Schneider Electric service centers are there for: The irons also serve in levelling the cement topcoat. Rear deflectors Wall fixing bracket mm min. It will be the reference point for levelling the irons. The durations for completing the operations mentioned given in the maintenance tables are purely an indication and depend on on-site conditions.

Make up a frame composed of two profile sections, laid out, one at the rear and one at the front, in the lengthwise direction of the switchboard. Schneider Electric, the Schneider Electric logo and their figurative forms are Schneider Electric registered trademarks. Pouring the cement top coat On the un-surfaced exposed concrete, pour a top coat of smooth finish, without ballast. If this is not the case, please refer to our Service Unit or Training Centre.

Particular instructions for operation and intervention with energized equipment When commissioning and operating the equipment under normal conditions, the Fluikit safety instructions for electrical applications must be respected, protective gloves, insulating stool, etc.

Each profile section comprises, every mm, a fixing plate welded and drilled with 2 holes of The durations for completing the 2m4 mentioned given in the maintenance tables are purely an indication and depend on on-site conditions. Preventive maintenance of the circuit breaker part Please refer to specific instructions See page 4.

The dressing of a top coat of cement using a rule should eliminate any surface irregularities greater than 2 mm per metre. Its thickness must be about m2 of cement dosed at kg of CPA. Local requirements especially about safety and which are in accordance with the indications given in this document, must be observed.

Next, discover our energy and sustainability services, including big data management, to turn this vision into your business reality. M12x30 hook bolt 8. Layout on a type 2 cable trough, with width of more than 50cm Whenever the width cluokit the cable trough exceeds 50 cm, it is necessary to fit the longitudinal support irons to support the left and right-hand uprights for each Functional Unit.

Installation of the frame. Case of a type 2 cable trough. Floor openings under the Functional Units 6. Threaded fasteners with grease: In this case a mounting base is added to the lower part of each Functional Unit in order to facilitate the penetration of the cable and respect the bend radius necessary for its connection. Non respect of these instructions is likely to invalidate any guarantee.

TOP Related Posts.

BRENDAN BRAZIER THRIVE FITNESS PDF

FLUOKIT M24 PDF

.

HITACHI CP RX82 PDF

Documents et livres connexes

.

APC AP7553 PDF

Poste de Livraison

.

Related Articles